wav already excavated into plateaux when the Government purchased it, and because also it would have been difficult to have found the requisite material in sufficient quantity for filling slope had been determined on.

An additional obstacle to the formation of a slope lay in the keen desires generally expressed that the covered playground and the open playground should both be level spaces.

I have the honour to be,

Sir, Your most obedient Servant,

Signed, M. Prie

Survey & General

5

Map Plan Elevation Sketch-Picture of the proposed Victoria College, Hong Kong, July 1883

1) Site Plan 2) Basement Plan 3) Ground Floor Plan and South Elevation

4) First Floor Plan 5) 3 Sections being Co129/210 have been removed to the Map Room.

Map Room Reference...

6 May 1955

M.PG. 793.

PAlimfold

Edit History

2026-05-23 11:08:35 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
20129/20 -HEND. Page 359 PUBLIC RECORD OFFICE. wav already excavated into plateaux when the Government purchased it, and because also it would have been difficult to have found the requisite material in sufficient quantity for filling slope had been determined on. An additional obstacle to the formation of a slope lay in the keen desires generally expressed that the covered playground and the open playground should both be level spaces. I have the honour to be, Sir, Your most obedient Servant, Signed, M. Prie Survey & General 5 Map Plan Elevation Sketch-Picture of the proposed Victoria College, Hong Kong, July 1883 1) Site Plan 2) Basement Plan 3) Ground Floor Plan and South Elevation 4) First Floor Plan 5) 3 Sections being Co129/210 have been removed to the Map Room. Map Room Reference... 6 May 1955 M.PG. 793. PAlimfold
Baseline (Original)
20129/20 -HEND." 359 PUBLIC RECORD OFFICE. wav already excavated into plateaux when the Government purchased it, and because also it would have ben difficult to have found the requisite material in sufficient quantity for filling slope had been deter- in f mined on. An additional obs- - tacle to the formation of a slope lay in the keen desires generally expressed that the covered play ground and the open play-ground should both be level spaces I have the honour to be, Sir. Your most obedient Dervant Sigued. M. Prie Survey & General 5 Map Plan Elevation Sketch-Picture of the proposed Victoria College, Hong Kong, July 1883 1) Site Plan 2) Basement Plan 3) Ground Floor Plan and South Elevation 4) First Floor Plan 5) 3 Sections being Co 129 /210 have been removed to the Map Room. Map Room Reference... 6 May 1955 M.PG. 793. PAlimfold
2026-05-23 11:08:35 · Baseline
View content

20129/20 -HEND."

359

PUBLIC RECORD OFFICE.

wav

already excavated into plateaux when the Government purchased it, and because also

it would have ben difficult to have found the requisite material

in sufficient quantity for filling slope had been deter-

in f mined on.

An additional obs-

- tacle to the formation of a slope lay in the keen desires generally expressed that the covered play ground and the open play-ground should both be level spaces

I have the honour to be,

Sir. Your most obedient Dervant

Sigued. M. Prie

Survey & General

5

Map Plan Elevation Sketch-Picture

of the proposed Victoria College, Hong Kong, July 1883

1) Site Plan 2) Basement Plan 3) Ground Floor Plan and South Elevation

4) First Floor Plan 5) 3 Sections

being Co 129 /210

have been removed to the Map Room.

Map Room Reference...

6 May 1955

M.PG. 793.

PAlimfold

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.